Friday, January 9, 2009

1859 Church - Final Cleanup

Time to clean it up and move on to the next project




1859 Church - Outside Walls

Only 1 thing left to do - bring the outside walls down 1/2 way




1859 Church - Main Building Cleanup

1st floor all but gone

The last of the mechanical equipment

These columns were not easy

One of the Bobcats is pulling from the outside

1859 Church - 1st Floor of Main Building

Can't get the Bobcats into the basement, so doing the 1st floor "old school"

That means, plank by plank, joist by joist, beam by beam


Columns up

Columns down

1859 Church - Main Building Cont'd

Getting close

Almost there

1859 Church - Wing Demo Cont'd & Starting Main

Not bad for 1 day


Starting sanctuary demo

Cut in big sections, let the bobcat do the rest

1859 Church - Wing Demo

Here is the wing. 2 floors vs 1 crew

Finishes cleaned out, ready for structural demo

2nd floor gone

Starting on 1st floor

1859 Church - Roof Trusses

2nd floor clean, ready to demo trusses

Perfectly planned !

Both sides down, starting to clean up

1859 Church - Starting Interior

1st floor demo with Bobcats


2nd floor demo by hand